Longma Dam | |
---|---|
|
|
Country | China |
Location | Mojiang County |
Coordinates | |
Status | Operational |
Construction began | 2003 |
Opening date | 2007 |
Construction cost | US$332 million |
Owner(s) | Yunnan Datang International Lixianjiang Hydropower Development Co., Ltd. |
Dam and spillways | |
Type of dam | Embankment, concrete-face rock-fill |
Height | 135 m (443 ft) |
Length | 315 m (1,033 ft) |
Crest width | 10 m (33 ft) |
Volume | 3,670,000 m3 (4,800,179 cu yd) |
Crest elevation | 643 m (2,110 ft) |
Impounds | Lixian River |
Reservoir | |
Capacity | 590,000,000 m3 (478,321 acre·ft) |
Power station | |
Commission date | 2007 |
Turbines | 3 x 80 MW Francis-type |
Installed capacity | 240 MW |
The Longma Dam is a concrete-face rock-fill dam on the Lixian River in Mojiang County, Yunnan Province, China. The primary purpose of the dam is hydroelectric power generation and it is the fourth of seven dams in the Lixian River Project.[1] It supports a 240 MW power station. Construction on the dam began on 23 December 2003 and the reservoir began to impound 20 July 2005. In July 2007, the first generator was commissioned and the last two were in December 2007. The project was complete in June 2008 at a cost of US$332 million.[2] The 135 m (443 ft) tall dam withholds a reservoir with a 590,000,000 m3 (478,321 acre·ft) capacity.[3]